Gaseous Applications-

Isolators

Media Load (Total Decontamination Cycle Time - 1 hour 20 minutes)

Cycle Parameters:

Chamber Volume (cu ft):

31

Chamber Pressure Relief Sp (Pa):

100

Chamber Pressure Relief:

Yes

Leak Test Sp (Pa):

85

Leak Test Time (min):

1

Leak Test Allowable Drop (Pa):

50

 

 

RH Condition Sp (%RH):

75

 RH Condition Time (min):

30

CD Concentration Sp (mg/L):

5

CD Expose Time (min):

30

Aeration Time (min):

10

Aeration Control:

Manual

Three consecutive validation runs were performed with 25 biological indicators (bacillus subtilis) placed throughout the chamber and load with NO positives throughout the runs.

 Media Load Cycle Chart

Component Load (Total Decontamination Cycle Time - 1 hour 20 minutes)

Cycle Parameters:

Chamber Volume (cu ft):

31

Chamber Pressure Relief Sp (Pa):

100

Chamber Pressure Relief:

Yes

Leak Test Sp (Pa):

85

Leak Test Time (min):

1

Leak Test Allowable Drop (Pa):

50

 

 

RH Condition Sp (%RH):

75

 RH Condition Time (min):

30

CD Concentration Sp (mg/L):

5

CD Expose Time (min):

30

Aeration Time (min):

10

Aeration Control:

Manual

Three consecutive validation runs were performed with 25 biological indicators (bacillus subtilis) placed throughout the chamber and load with NO positives throughout the runs.

Component Load Cycle Chart

setstats 1